Laining From Malout To Sadhuwali

Project Overview

FOUR LAINING FROM MALOUT (DESIGN KM 45.600, EXISTING KM 80.200 OF NH-07) VIA ABOHAR (DESIGN KM 77.600, EXISTING KM 48.200 OH NH-07) TO SADHUWALI

images

DESIGN KM 33.000, EXISTING KM 33.000 OF NH-62) DESIGN LENGTH = 65.000 KM IN THE STATE OF PUNJAB UNDER BHARATMALA PARIYOJNA ON HYBRID ANNUITY MODE (HAM)

State

  • Location:

    PUNJAB

  • Given Time (as per NHAI)

    24 months

  • Time Taken

    13 months

  • Start Date (as per NHAI)

    02nd DECEMBER 2021 TO 08th FEBRUARY 2023

  • Cost of the Project (Cr)

    125.09