RK CONSTRUCTIONS

New York Office

123 Steel Avenue New York, NY 10001 United States

Chicago Office

456 Iron Street Chicago, IL 60607 United States

Los Angeles Office

789 Metal Lane Los Angeles, CA 90015 United States

images
Contact Us

Danapur-Bihta Corridor Construction

Project Overview

CONSTRUCTION OF FOUR LANE ELEVATED CORRIDOR AND AT – GRADE IMPROVEMENTS FROM DESIGN Ch. 0+000 TO DESIGN Ch. 19+870 OF DANAPUR – BIHTA SECTION WITH PROVIDING CONNECTIVITY TO THE EXISTING ROB NEAR DANAPUR SECTION (0.231 KM), 1.35KM RAMPS & AT GRADE IMPROVEMENTS TO FOUR LANE SECTION ON DANAPUR SIDE AND UPGRADATION OF DESIGN Ch. 23+500 OF BIHTA-KOILWAR SECTION

images

CONSTRUCTION OF FOUR LANE ELEVATED CORRIDOR AND AT – GRADE IMPROVEMENTS FROM DESIGN Ch. 0+000 TO DESIGN Ch. 19+870 OF DANAPUR – BIHTA SECTION WITH PROVIDING CONNECTIVITY TO THE EXISTING ROB NEAR DANAPUR SECTION (0.231 KM), 1.35KM RAMPS & AT GRADE IMPROVEMENTS TO FOUR LANE SECTION ON DANAPUR SIDE AND UPGRADATION OF DESIGN Ch. 23+500 OF BIHTA-KOILWAR SECTION

State

  • Location:

    BIHAR

  • Start Date (as per NHAI)

    30th June 2024

  • Cost of the Project (Cr)

    40